AES Morning Toolbox Meeting Log


Next  | Last
RESPONSIBLE GROUP ASSIGNMENT OF WORK DISCUSSION OF EXISTING JOB STATUS PRE-JOB BRIEFINGS SAFETY QUESTIONS OR COMMENTS DATE
MOM M.Bracken - Bld'gs 378 & 335 reconfiguration, labeling of equipment for disposal or excessed; D. Ereksen - Pump vibration; J. Pace - RF systems; J.Rice - LN2 line installation; J. Dench - TOuch screens or bak out skids, Water skids controls; R. Furst/C. Sarne - Airline for Ray Ziegler, label pipes and airlines, replace LN2 hose in truck airlock; D. Burke - LCLS vacuum chambers; M. Bracken - Machine tool inspection.- R. On-going Yes

Rice - working under WCD55512.0 Sarne and Furst - WCD52462.0 &52434.2 All others - WCD52434.2 All jobs are low hazard - watch for pinch points. Situation awareness.

Jul 24, 2018
MOM 1 new Task assigned Work continues on several tasks Pre-Job Brief is in place for the new task

Group leader came to the meeting and discussed Fresh Eyes, Fresh Perspectives safety initiative.

Apr 02, 2018
MOM 1 New Job Assigned 1 job completed 1 new required

No issues

Mar 30, 2018
MOM No new tasks assigned 1 tasks completed 1 will be closed out

No issues or concerns

Mar 29, 2018
MOM 1 new Task assigned Work continues on several tasks 1 New PJB will be performed

We had a group discussion about the new rules regarding concrete drilling, and silica dust exposure.

Mar 27, 2018
MOM 1 new Task assigned Work is ongoing No new PJB required

No issues or concerns

Mar 26, 2018
MOM 1 new Task assigned Work conitnues on several tasks 1 New PJB

No questions or concerns

Mar 23, 2018
MOM 1 new Task assigned Work conitnues on several tasks 2 will be closed out, no new ones required

No safety issues or concerns

Mar 20, 2018
MOM 1 new Task assigned Work conitnues on several tasks Not required

No safety issues

Mar 13, 2018
MOM So far this morning 2 new tasks. Work is ongoing 1 New PJB, possibly another. Will be determined after looking at job

No issues

Mar 12, 2018